Chemical plant Security Gate access control Sliding barrier and swing barrier turnstile gate

27-07-2020

Chemical plant Security Gate access control Sliding barrier and swing barrier turnstile gate


  1. As we all know, the air of chemical plants contains a lot of chemical components,

so when installing channel gates, we must fully consider the materials and mechanisms of the equipment.

Chemical plant Security

2. Stainless steel 316 material can effectively prevent corrosion.

Access Control

3.Sliding road barriers can effectively restrict the entry and exit of vehicles and play a certain security role.

The swing gate can facilitate the entry and exit of employees and investigate the entry and exit records.

sliding road barrier

Of course, if the lifting column is installed, his security level will rise another step.

Chemical plant Security

Access Control

sliding road barrier

Equipment installation

Ready tool to install equipment, need the  impact drill, wrenches, hammers, expansion screws M10 * 15 or M12 * 15 of 4 pieces each machine.

Multi-channel devices installed, please be sure to follow the numbering sequence on the machine display,the chassis number on the cover on the same side, are not free to replace the machine direction, in accordance with the number placed in the machine,ready to begin installation

After placing machine, then powered onconfirm alignment of flap turnstile   and arm,every edge of the chassis is in the line.After make sure spacing on both sides of the chassis is same,mark hole positioning and burying position. Please be noted the space between swing arm is 50-100mm;

After confirming the fixed line holes and hole locations,drilled holes,and embedded M10 or M12 expansion screws;

The strong and weak electric cables respectively cable with 3/4 "PVC pipe, buried with cement to the appropriate location;

Each enclosure move to corresponding mounting position,level Bolt-bit one by one;

Check whether the system composition and working methods are correct or notAfter check it is correct,then start the next step work;

Refer to wiring diagram,connect the power cord,control line and system protective ground line;

After check the state examination and functional debugging,then tighten the foot nut.


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy