Office building speed swing gate face recognition time attendance access

09-07-2020

Office building speed swing gate face recognition time attendance access 



In order to implement an efficient and safe building management system, some commercial buildings 

have been successively installed with fast-pass doors, equipped with access control such as face recognition 

or swiping barcodes, and increased the safety management of building employees. Staff entry and exit are 

more orderly, colleagues It also reduces the work of security personnel

What are you waiting for!!!

Eva 

+8615875593512

eva@tdzgs.com

office building speed gate

face recognition access control

Basic Function

² The entry and exit directional can be set independently, free mode / forbidden model

² Automatic reset function: The swing barrier will open the arm after receiving the valid opening signal when standby. The swing barrier will return to the hindered zero position automatically under the following situation

--. Within the allowed time, pedestrians have been detected to pass through the passageway in specified direction;

--. Over the allowed time, there is no people passing through the passageway.

² Self-recovery function: The swing barrier do not return to the hindered zero position because of human intervention. After revoking human intervention, the gate automatically return to the hindered zero position.

² Direction indicator: The direction indicator is installed on the top of the housing cabinet to indicate the valid passing direction

² Compatibility: Equipped with dry contact signal input interface can make sure compatible with all kinds of access controllers

 

Equipment installation

Ready tool to install equipment, need the  impact drill, wrenches, hammers, expansion screws M10 * 15 or M12 * 15 of 4 pieces each machine.

Multi-channel devices installed, please be sure to follow the numbering sequence on the machine display,the chassis number on the cover on the same side, are not free to replace the machine direction, in accordance with the number placed in the machine,ready to begin installation

After placing machine, then powered onconfirm alignment of flap turnstile   and arm,every edge of the chassis is in the line.After make sure spacing on both sides of the chassis is same,mark hole positioning and burying position. Please be noted the space between swing arm is 50-100mm;

After confirming the fixed line holes and hole locations,drilled holes,and embedded M10 or M12 expansion screws;

The strong and weak electric cables respectively cable with 3/4 "PVC pipe, buried with cement to the appropriate location;

Each enclosure move to corresponding mounting position,level Bolt-bit one by one;

Check whether the system composition and working methods are correct or notAfter check it is correct,then start the next step work;

Refer to wiring diagram,connect the power cord,control line and system protective ground line;

After check the state examination and functional debugging,then tighten the foot nut.



Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy