Outdoor Using Flap barrier gate turnstile 3 lanes bidirectional

30-11-2020

Outdoor Using Flap barrier gate turnstile 3 lanes bidirectional

1.Size: 1200x300x1000mm;
2. Unlock time: 0.2s;
3. Traffic speed: ≤35 people/min;
4. Channel width: ≤600mm;
5. Voltage input: 220V, 50HZ;
7. Wing gate thickness: 15mm acrylic, transparent, red and blue gates are optional, and can be replaced with soft-wing doors
8. Ambient temperature: -25℃~+70℃;
9. Opening signal input: dry contact;
10. Service life: ≥ 5 million times
11. Single movement weight: about 55KG, double movement weight about 75KG

ourdoor flap gate

Flap barrier

1.304 stainless steel;
2. Material thickness: cover 1.2mm, box 1.0mm
3. Box body laser cutting processing; precision welding, precision grinding process;
4. Original wire drawing on the surface;
5. Infrared anti-pinch protection;
6. Infrared alarm for illegal intrusion;
7. Swipe to open the gate and alarm for reverse travel;
8. Highlight green direction indicator board;
9. 3 pairs of hard wing / 5 pairs of soft wing circular infrared;
10. Self-owned patent gate main board
11. The color of hard-wing gate can be transparent, blue, red

Equipment installation

Ready tool to install equipment, need the  impact drill, wrenches, hammers, expansion screws M10 * 15 or M12 * 15 of 4 pieces each machine.

Multi-channel devices installed, please be sure to follow the numbering sequence on the machine display,the chassis number on the cover on the same side, are not free to replace the machine direction, in accordance with the number placed in the machine,ready to begin installation

After placing machine, then powered onconfirm alignment of flap turnstile   and arm,every edge of the chassis is in the line.After make sure spacing on both sides of the chassis is same,mark hole positioning and burying position. Please be noted the space between swing arm is 50-100mm;

After confirming the fixed line holes and hole locations,drilled holes,and embedded M10 or M12 expansion screws;

The strong and weak electric cables respectively cable with 3/4 "PVC pipe, buried with cement to the appropriate location;

Each enclosure move to corresponding mounting position,level Bolt-bit one by one;

Check whether the system composition and working methods are correct or notAfter check it is correct,then start the next step work;

Refer to wiring diagram,connect the power cord,control line and system protective ground line;

After check the state examination and functional debugging,then tighten the foot nut.


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy