This is the installation steps of school lifting bollards.
This is the installation steps of school lifting bollards.
As soon as more than ten lifting bollards arrived at the site, installation was started.
1.Digging and put into the lifting bollards.
According to our standard installation and wiring diagram, dig the trench after measuring the position,
then lay the gravel layer at the bottom of the trench, level it, and leave the wells on both sides of the trench.
Then you can put the lifting bollards into the groove and adjust the distance according to the interval.
Note, because the lifting bollard is relatively heavy, for safety reasons, it is recommended to use the machine to lift the lifting bollards into the trench.
With the help of the machine, it can also avoid a lot of labor when moving the position.
2. Standard lifting column installation wiring diagram
After stabilizing the lifting bollards, fill the soil to a fixed position, and then you can connect wires.
3.Wiring site
After the wire is connected, it have to be tested; You can do next step only after the test succeed.
4. Testing the working situation of the bollards.
5.Tidy up the wire tube
Test the lifting bollards, tidy up the tube, and then fill it with cement to fix the ground. Once the cement is dry and the road surface is restored, it can be completed!